Recent Work See Our Drilling Projects

From drilling solutions and remediation to excavation and groundwater treatment systems, you can count on Betts Environmental to get the job done right.

Featured Project PFAS Site Investigation & Well Installation

Arnold Air Force Base (Arnold, TN)

Our team installed 53 groundwater monitoring wells and performed 30 additional soil borings for the first phase of a PFAS Remedial Investigation at Arnold Air Force Base for a major Federal client. Drilling was tricky as the wells ranged in depths and the team encountered a significant amount of bedrock in the borings and was not able to introduce a lot of water due to the Clients need to strongly identify the presence of groundwater in the well which required our team to sonic core the bedrock mostly dry which we successfully did. Safety protocols and operating procedures were rigorous as usual due to the presence of PFAS and the needs of the Air Force base. Our team navigated ammunition areas and safely operated installing wells within an active airfield. The project was completed on time and under budget and provided another satisfied Client.

17SERVICES_PFAS drilling

"Betts installed 53 groundwater monitoring wells and performed 30 additional soil borings for the first phase of a PFAS Remedial Investigation at Arnold Air Force Base.  Betts was professional throughout the job and the drillers were diligent overcoming the challenges that arise with this sort of project.  Betts took pride in the quality of the project by ensuring the downhole equipment and materials were PFAS-free and the job was done correctly. Experienced drillers and new equipment provided by Betts limited downtime.  I look forward to working with the Betts on our project."

Senior Geologist and Project Manager, Ensafe